npressfetimg-9263.png

Roadway Activity Report for parts of East and Middle Tennessee (September 29 – October 5, 2022) – tn.gov

Asphalt Contractor

DISTRICT 27

CUMBERLAND COUNTY I-40 resurfacing from shut to Plateau Road (MM 311) To close the Obed River (MM 318): Nightly lane closures on I-40 from shut to MM 311 to MM 317 working in each courses from 7 PM To six AM Sunday Evening time by way of Friday morning. Work is being pertypeed on The floor ought toer. Motorists ought to use warning when automobiles are Getting into and exiting the work zone.

[Rogers Group, Inc./Strong/CNW084]

 

CUMBERLAND COUNTY I-40 Utility Work each courses from MM 301 to MM 329: THP assisted rolling roadblock aprolongedside I-40 between Exit 329 (Crab Orchard Relaxation Space) and Exit 301 (Monterey). Motorists Should be ready to sprime And Confacetr personnel and gear when touring by way of the work zone. THP, vans, and signalage Shall be current, 10/02/22 from 5:30 AM to 7 AM. [2022-131]

 

CUMBERLAND COUNTY SR-1 (US-70) resurfacing from LM 13 (west of SR-24) to LM 16.3 (east of Village Method) collectively with SR-24 east of Obed Road: The contractor has begun resurfacing on SR-1 (West Avenue) from LM 13.0 to LM 16.3 from 7 PM To six AM Sunday Evening time by way of Friday morning. Flagging operations Shall be used Through the resurfacing work. Motorists ought to use warning when touring by way of the work zone.

[Rogers Group, Inc./Strong/CNW201]

 

CUMBERLAND COUNTY SR-28 (US-127) bridge enchancment and paving from north of I-40 (LM 17.8) To close Potato Farm Road (LM 22.7): The contractor proceeds grading actions. Short-term lane closures and/or intervalic visitors sprimepages Shall be needed for enchancment actions. Utility replaces are in …….

Source: https://www.tn.gov/tdot/news/2022/9/30/roadway-activity-report-for-parts-of-east-and-middle-tennessee–september-29—october-5–2022-.html

RSS Feeds

Related Posts